Identification of obstacles with regard to financing and the development and operation of charging infrastructure

This Mission deals with the identification and recording of obstacles with regard to the financing and the development and operation of electric charging infrastructures.

In 2022, an interdisciplinary working group was set up with the aim of identifying and compiling as many of the remaining obstacles to the financing, development and operation of electric charging infrastructure as possible. In order to draw up a comprehensive inventory of the existing challenges, the working group was made up of representatives of the relevant stakeholders.

A total of 112 obstacles were identified. The mission was completed in January 2023.

Parties Involved

  • Ministry of the Environment, Climate Protection and the Energy Sector of Baden-Württemberg
  • Ministry of Transport Baden-Württemberg
  • e-mobil BW GmbH
  • EnBW Energie Baden-Württemberg AG
  • Fachverband Elektro- und Informationstechnik Baden-Württemberg (Association of the electrical engineering and information technology industry in Baden-Württemberg)
  • Handelsverband Baden-Württemberg e. V.
  • Netze BW GmbH
  • Verband baden-württembergischer Wohnungs- und Immobilienunternehmen e.V.
  • Verband der Immobilienverwalter Baden-Württemberg e. V.
  • Verband kommunaler Unternehmen e.V. – Baden-Württemberg chapter
  • VfEW Verband für Energie- und Wasserwirtschaft Baden-Württemberg e. V.

 

#Energy