Skip to main content
© shutterstock.com / petrmalinak

Identification of obstacles with regard to financing and the development and operation of charging infrastructure

Mission III deals with the identification and recording of obstacles with regard to the financing and the development and operation of electric charging infrastructures.

The interdisciplinary working groups identifies and classifies existing hurdles in the development of charging infrastructures and jointly develops a paper that will identify the respective responsibilities. Fields of action will be defined for the follow-up mission VII “Development of measures to reduce obstacles with regard to financing and the development and operation of charging infrastructure”. The working group started its activities in June 2022 and will prepare its paper over the summer.

Beteiligte

  • Ministry of the Environment, Climate Protection and the Energy Sector Baden-Württemberg
  • Ministry of Transport Baden-Württemberg
  • e-mobil BW GmbH
  • Electrify-BW e. V.
  • EnBW Energy Baden-Württemberg AG
  • Association of the electrical engineering and information technology industry in Baden-Württemberg
  • Handelsverband Baden-Württemberg e. V.
  • State capital Stuttgart
  • Netze BW GmbH
  • Verband baden-württembergischer Wohnungs- und Immobilienunternehmen e. V.
  • German Association of the Automotive Industry (VDA)
  • Verband der Immobilienverwalter Baden-Württemberg e. V.
  • Verband kommunaler Unternehmen e. V. – Baden-Württemberg section
  • VfEW Verband für Energie- und Wasserwirtschaft Baden-Württemberg e. V.
#Energy